Ragan-Smith provided roadway design for 1.8 miles of SR 106. The project consisted of the initial study, along with right-of-way plans, construction plans, and intersection studies. Ragan-Smith utilized highway capacity analysis, and traffic simulation to analyze alternative laneage, signal phasing, railraod crossing preemption operation, and recommendations to lanes, channelization, signalization, and geometry.